Sheet02 / 08
Redline · pre-load checkThe check
Rev A2026-10-22
StatusBRC-28BLOCK

The check, Drift

Drift

Legacy against loaded, for the parallel run.

During a parallel run the legacy tool stays live while Planisware takes over. Run this diff every week: legacy export against post-load export. A date which moved in one system and not the other shows up here before the steering meeting does.

Scope
Snapshots
2026-10-01 against 2026-10-15
Dates changed
5
Max shift
12 days
Activities missing
2
Resources renamed
2
Milestone dates changed between snapshotsSample data
MilestoneProgramLegacy planning tool exportPost-load exportShift, days
ALD-MS13 Homologation grantedALD-272028-06-262028-06-29+3
BRC-MS09 Prototype releaseBRC-282027-06-152027-06-13-2
BRC-MS11 First part shippedBRC-282028-01-072028-01-19+12
CDR-MS12 Part approval grantedCDR-272028-05-262028-05-31+5
CDR-MS14 Launch reviewCDR-272028-08-282028-09-04+7
Activities missing after load
ActivityProgram
BRC-A41 Ramp-up monitoringBRC-28
CDR-A47 Program closeout reportCDR-27
Resources renamed (shared across programs)
CodeLegacy nameLoaded name
RES-009Electrical integration engineer 4Electrical integration engineer 4 (contract)
RES-021Program controls analyst 2Program controls analyst 2 (Cost)

Sheet index

  1. 01CoverWho built Redline, what the check does, and where to start.
  2. 02The checkThe working tool: programs, rules, trace, ledger, gate, SQL bench, drift.2 of 3 blockedBLOCK
  3. 03Case studyContext, observations, solution, measurement plan, and limits.
  4. 04Readiness auditPrioritized findings with evidence, printable.
  5. 05WorkbookSix guided exercises on the sample data.
  6. 06First 90 daysSix two-week sprints with stories and acceptance criteria.
  7. 07FitRequirement to evidence map, with the gaps stated plainly.
  8. 08SystemTokens, components, motion spec, and how to adapt the set.
  9. ATTAttachmentsResume, cover letter, sample data, and session exports.

Arrow keys move. Enter opens. Esc closes.